Construction Process Click on the photos below for more information about each step of your next steel swimming pool installation. 1. Pool location is determined. 2. Elevation is set. 3. Pool location is established and layed out. 4. Excavation begins. 5. Pool walls are set in place as the excavation continues. 6. Adjustable alignment bracing is set and staked to anchor walls. Concrete footing is poured and walls are aligned. 7. Pool is backfilled and aluminum coping or liner receptor is installed. Concrete decking is formed. 8. Concrete decking, or optional concrete border is poured. 9. Sub deck is prepared for optional paver installation. 10. Paver decking is installed. 11. Aggregate bottom is hand troweled in place. Bottom is then cleaned and prepared for liner installation. 12. Liner is installed, vacuumed in place and filling starts. 13. Ladder, handrails, filter system and accessories are installed. Royal Palm Pools, Inc PO Box 985 | Monroe, NC 28112 704-282-4424 704-292-1248 jc@rppmfg.com Navigate the Site Downloads Royal Palm Royal Palm Pools Design Guide Royal Palm Pools Dig Book Armor-Clad Armor-Clad Fence Brochure Panel Form Panel Form Brochure Panel Form Step Drawings Panel Form Bench Drawings Panel Form Sunledge Drawings